No certified or commercially released machine exists.
TRUST IS PART
OF THE MACHINE.
Swovee combines mobility, material processing, robotics and AI near people, property and the environment. That demands visible limits—not a promise that autonomy solves risk.
No concept drawing, simulator score or debrief, estimate, scan or AI output authorizes fabrication, autonomous operation or construction.
WHAT IS TRUE
TODAY.
Targets and proposed controls still require engineering and independent validation.
This website is not a preorder, quotation or promise of delivery.
Legal entity, jurisdiction and monitored reporting contacts have not yet been published.
AUTONOMY WITH
A HARD EDGE.
An operational design domain, or ODD, defines where and under what conditions the machine may work. The final ODD is not yet established.
Field release requires evidence
Before a supervised pilot, Swovee must define terrain, slope, bearing, weather, visibility, communications and traffic limits; protective zones and stopping distances; degraded modes; safe restart; manual recovery; and site commissioning.
People own the stop
A site controller, trained operator, material-process operator, competent person and emergency authority must be named for the job. Pre-start checks, stop-work authority, energy isolation, shift handoff and incident response are operational requirements.
CONTROL THE PROCESS.
KEEP THE WASTE.
Silica + cement
Dry transfer must be enclosed and controlled. A site-specific exposure plan, competent person, training, SDS access, PPE, washing and eyewash provisions remain required before handling cementitious material.
Wet-path energy
Pumps, hoses, couplings, guards and blockage-recovery methods require ratings, containment and verified zero-energy isolation. A reversible pump is not itself a safety case.
No uncontrolled washout
Prime, purge, washwater, rejected material and hardened waste must enter a sized, inspected custody path. Storm drains, soil and surface water are not disposal routes.
Local rules govern
Noise, dust, runoff, waste, spill, water and environmental-permit requirements are determined for each site and jurisdiction. The concept cannot pre-approve them.
A PRINT IS NOT
A PERMIT.
Surface scanning and additive-process records support decisions. They do not replace licensed design, subsurface investigation, code approval or inspection.
- 01Site authority
Document access rights, planning constraints and the authorized work polygon.
- 02Professional evidence
Obtain survey, utility locating, geotechnical, environmental and hydrology evidence as required.
- 03Signed design
Licensed professionals establish the structural system, material basis and site-specific job package.
- 04Permit + release
The authority having jurisdiction, owner and named acceptance authorities approve the work before motion or placement.
- 05Inspect + accept
Retain material, process, geometry, exception, repair, as-built and inspection records.
VISIBLE SURFACE.
BOUNDED AUTHORITY.
Owner-authorized search only
A proposed scout pass is limited to a documented work polygon. LiDAR and cameras cannot establish property rights, soil bearing, utilities, groundwater, contamination or code compliance. Bystander imagery, neighboring land, retention and reuse require separate governance.
Read the interim privacy notice →Secure-by-design target
Safety controls must remain independent of generative AI and resilient to network or planning faults. Secure boot, signed updates, access control, segmentation, software inventory, logging and vulnerability response are required design work—not current certifications.
Review security posture →SHOW THE LIMIT.
SHOW THE EVIDENCE.
This page is a public commitment to the work still required. It is not a certification, conformity assessment, permit, insurance representation or warranty.