Where is the lowest-risk build?
Swovee combines visible terrain with imported constraints, then compares what the construction campaign would demand at each candidate location.
Within an owner-authorized search area, Swovee audits the proposed footprint and nearby options before committing the construction plan.
View a sample assessment ↓The assessment compares footprints, orientations, approach routes, staging zones and material-refill positions inside the authorized boundary. Neighboring land is never treated as available without permission.
Swovee combines visible terrain with imported constraints, then compares what the construction campaign would demand at each candidate location.
Slope, grade break, roughness, drainage indicators, erosion, vegetation and obstacles.
Access, turning, stabilizer positions, arm coverage, relocation count and recovery routes.
Material delivery, refill pod, power, water, communications, crew and emergency access.
Footprint fit, orientation, preliminary sitework, printed volume, time and direct cost.
A recommendation is only as strong as its weakest decisive input. Every layer records source, date, confidence and unresolved questions.
A georeferenced scout pass measures the surface Swovee can actually see and traverse.
Authoritative records and project data constrain the search before an option can be recommended.
Named specialists close the subsurface, legal and regulatory questions the surface scan cannot answer.
AI helps generate and compare options. Deterministic rules remove unsafe or unauthorized options. Named professionals close the evidence gaps.
Set the project brief, authorized search polygon, decision weights and hard exclusions.
Register survey control, parcel data, utilities, planning constraints and available site records.
Drive the approved area, fuse LiDAR and vision, and mark every unseen or uncertain region.
Reject conflicts before scoring: rights, exclusion zones, unsafe traverses and machine-limit violations.
Test footprints, orientations, rover stations, access, material flow, energy, sitework and schedule.
Return multiple viable options with evidence-linked scores, confidence and unresolved requirements.
Professionals investigate the preferred option before any signed construction package exists.
AUTHORITYOutside the owner-authorized search polygon or without documented access rights.
SAFETYNo compliant emergency route, work-zone separation or recoverable rover traverse.
MACHINESlope, clearance, ground contact or arm coverage outside the approved operating envelope.
RECORDKnown floodway, protected area, utility conflict or planning exclusion without an approved resolution.
EVIDENCECritical data absent or contradictory enough that ranking would create false confidence.
Illustrative interface only—these are not measurements from a real parcel and the score is not a permit, engineering conclusion or property valuation.
Moderate visible grade, direct delivery access, efficient rover coverage and the lowest preliminary earthwork demand.
The output tells the owner what looks viable, why, what it may cost to enable and exactly what must be verified next.
Surface mesh, control, confidence and unresolved-observation layers.
Build, staging, refill and access polygons with proceed, investigate or no-go status.
Rover stations, paths, print volume, refill cycles, operating hours and energy bands.
Relative grading, access preparation, drainage exposure, cost and schedule ranges.
Exact surveys, tests, permits and specialist decisions needed to advance each option.
Source, date, confidence, assumption and revision history behind every recommendation.
No known hard stop; advance the named verification work.
Potentially viable, but one or more decisive questions remain open.
Do not spend design or mobilization capital unless the evidence changes.
A mandatory input is absent or contradictory. The option is not scored until it is resolved.
LiDAR and cameras cannot independently establish soil bearing capacity, buried utilities, groundwater, contamination, voids, property rights or code compliance.
AI proposes and compares options. It does not approve structures, grant permits or authorize construction. A signed job package follows—not precedes—the required professional evidence.
The proposed assessment starts with a project brief, authorized search boundary and available site records. Sensitive site intake is not open; review the controlled pilot sequence before preparing records.