SWOVEESITE INTELLIGENCE / 01Home ↗
SITE SUITABILITY / BEFORE THE FIRST LAYERCONCEPT WORKFLOW

DON'T ASK ONLY
CAN IT BUILD?
ASK WHERE IT
SHOULD BUILD.

Within an owner-authorized search area, Swovee audits the proposed footprint and nearby options before committing the construction plan.

View a sample assessment ↓
SEARCH BASIS1 polygonOwner-authorized only
OUTPUT3+ optionsRanked, not opaque
STATUSConditionalEvidence governs
RULENo guessingUnknown stays unknown
01 / SEARCH THE VICINITY

ONE PARCEL.
SEVERAL BUILD FUTURES.

The assessment compares footprints, orientations, approach routes, staging zones and material-refill positions inside the authorized boundary. Neighboring land is never treated as available without permission.

THE QUESTION

Where is the lowest-risk build?

Swovee combines visible terrain with imported constraints, then compares what the construction campaign would demand at each candidate location.

SURFACE

Slope, grade break, roughness, drainage indicators, erosion, vegetation and obstacles.

MACHINE

Access, turning, stabilizer positions, arm coverage, relocation count and recovery routes.

LOGISTICS

Material delivery, refill pod, power, water, communications, crew and emergency access.

PROJECT

Footprint fit, orientation, preliminary sitework, printed volume, time and direct cost.

02 / EVIDENCE STACK

THREE LAYERS.
ONE AUDIT TRAIL.

A recommendation is only as strong as its weakest decisive input. Every layer records source, date, confidence and unresolved questions.

01OBSERVED BY SWOVEE

Visible ground truth

A georeferenced scout pass measures the surface Swovee can actually see and traverse.

  • LiDAR elevation + slope
  • Surface roughness + obstacles
  • Visible drainage indicators
  • Access width + turning space
  • Rover pose + stabilizer reach
  • Occlusion + confidence map
02IMPORTED RECORDS

Context beyond the sensor

Authoritative records and project data constrain the search before an option can be recommended.

  • Cadastral boundary + rights
  • Setbacks + planning controls
  • Flood + habitat overlays
  • Utility and road records
  • Prior surveys + site history
  • Weather + emergency access
03FIELD-VERIFIED

Evidence AI cannot invent

Named specialists close the subsurface, legal and regulatory questions the surface scan cannot answer.

  • Bearing + settlement
  • Buried utilities + voids
  • Groundwater + contamination
  • Hydrology + erosion
  • Environmental review
  • Permits + acceptance authority
03 / ASSESSMENT LOOP

FROM SEARCH AREA
TO SHORTLIST.

AI helps generate and compare options. Deterministic rules remove unsafe or unauthorized options. Named professionals close the evidence gaps.

  1. 01
    Define

    Set the project brief, authorized search polygon, decision weights and hard exclusions.

  2. 02
    Ingest

    Register survey control, parcel data, utilities, planning constraints and available site records.

  3. 03
    Scout

    Drive the approved area, fuse LiDAR and vision, and mark every unseen or uncertain region.

  4. 04
    Screen

    Reject conflicts before scoring: rights, exclusion zones, unsafe traverses and machine-limit violations.

  5. 05
    Simulate

    Test footprints, orientations, rover stations, access, material flow, energy, sitework and schedule.

  6. 06
    Rank

    Return multiple viable options with evidence-linked scores, confidence and unresolved requirements.

  7. 07
    Release

    Professionals investigate the preferred option before any signed construction package exists.

HARD-STOP SCREEN

Not every location deserves a score.

AUTHORITYOutside the owner-authorized search polygon or without documented access rights.

SAFETYNo compliant emergency route, work-zone separation or recoverable rover traverse.

MACHINESlope, clearance, ground contact or arm coverage outside the approved operating envelope.

RECORDKnown floodway, protected area, utility conflict or planning exclusion without an approved resolution.

EVIDENCECritical data absent or contradictory enough that ranking would create false confidence.

04 / SAMPLE DECISION PACKAGE

RANK THE OPTIONS.
SHOW THE DOUBT.

Illustrative interface only—these are not measurements from a real parcel and the score is not a permit, engineering conclusion or property valuation.

EXAMPLE / 140 m² FIELD SHELLSEARCH POLYGON / 2.8 haDATASET: SYNTHETIC
N ↑ACCESSVISIBLE DRAINAGE
PreferredInvestigateNo-go
ZONE A / PREFERRED / CONDITIONAL
87SUITABILITY76CONFIDENCE

Upper bench

Moderate visible grade, direct delivery access, efficient rover coverage and the lowest preliminary earthwork demand.

Surface buildability91HIGH CONFIDENCE
Access + egress88MEDIUM CONFIDENCE
Drainage indicators84MEDIUM CONFIDENCE
Material logistics92HIGH CONFIDENCE
Evidence completeness78FIELD WORK OPEN
Preliminary print scope48–56 m³
Rover stations18–22
Refill events72–90
Sitework band$42K–$58K
05 / CUSTOMER HANDOFF

A DECISION PACKAGE.
NOT JUST A POINT CLOUD.

The output tells the owner what looks viable, why, what it may cost to enable and exactly what must be verified next.

01

Georeferenced site twin

Surface mesh, control, confidence and unresolved-observation layers.

02

Ranked option register

Build, staging, refill and access polygons with proceed, investigate or no-go status.

03

Preliminary campaign

Rover stations, paths, print volume, refill cycles, operating hours and energy bands.

04

Sitework comparison

Relative grading, access preparation, drainage exposure, cost and schedule ranges.

05

Evidence request

Exact surveys, tests, permits and specialist decisions needed to advance each option.

06

Decision trace

Source, date, confidence, assumption and revision history behind every recommendation.

01PROCEED TO ENGINEERING

No known hard stop; advance the named verification work.

02CONDITIONAL—INVESTIGATE

Potentially viable, but one or more decisive questions remain open.

03NO-GO ON CURRENT BASIS

Do not spend design or mobilization capital unless the evidence changes.

04HOLD—NOT ASSESSABLE

A mandatory input is absent or contradictory. The option is not scored until it is resolved.

WHAT THE ASSESSMENT DOES NOT CLAIM

VISIBLE SURFACE
IS NOT SUBSURFACE TRUTH.

LiDAR and cameras cannot independently establish soil bearing capacity, buried utilities, groundwater, contamination, voids, property rights or code compliance.

AI proposes and compares options. It does not approve structures, grant permits or authorize construction. A signed job package follows—not precedes—the required professional evidence.

SITE INTELLIGENCE / FUTURE PILOT INPUT

BRING A PARCEL.
LEAVE WITH OPTIONS.

The proposed assessment starts with a project brief, authorized search boundary and available site records. Sensitive site intake is not open; review the controlled pilot sequence before preparing records.

Review the pilot path →Compare build economics →