Build a system.
Not a demo.
The complete Swovee work package—now including the autonomous Scoop, lunar construction loop and honest Mars material architecture.
Choose the question you need answered.
Architecture + budgets
What is inside the Swovee system boundary, and which coupled budgets control it?
OPEN CHAPTER ↗02 / MATERIALSInputs + material plant
What goes in, what comes out, and how does the rover mix and load concrete?
OPEN CHAPTER ↗03 / OFFWORLDMoon + Mars field cell
How does Swovee excavate, make waterless feedstock and build before a crew arrives?
OPEN CHAPTER ↗04 / VALIDATIONSafety + test gates
What evidence allows the machine to advance from bench rig to field pilot?
OPEN CHAPTER ↗05 / DELIVERYTeam + build plan
Who owns the interfaces, and what must the first team deliver?
OPEN CHAPTER ↗Read the chapter openings and decision boxes.
They isolate the question, proposed architecture and condition for moving forward.
Follow interfaces, budgets and acceptance evidence.
Those are the handoffs that prevent the rover, material plant and structure from becoming separate projects.
Start with validation.
Every major assertion is tied to a test gate, owner or explicit reason to stop.