Swovee is a concept-stage engineering program. This ledger separates what has been published from what remains proposed, targeted, unvalidated, uncertified and unavailable.

INTEGRATED MACHINES0Represented as fabricated
PAID PILOTS0Publicly reported
COMMERCIAL DEPLOYMENTS0Publicly reported
HARDWARE PREORDERSNONENot offered
01 / PRODUCT LEDGER

WHAT EXISTS.
WHAT DOES NOT.

A strong concept can be inspectable without being saleable. Each record names the next evidence that could change its status.

A02Earth RovalizerCONCEPT ARCHITECTURE
PUBLICLY EXISTS

System requirements, target specifications, operating logic, safety boundary, material-path architecture and controlled A0 packaging geometry. The public download is imagery-only.

NOT ESTABLISHED

No integrated machine, coupled material loop, field-hour record, certified safety case, structural release or commercial unit is represented.

NEXT EVIDENCE

Bench material loop → motion mule → coupled Alpha → independently reviewed pilot release

Inspect current basis ↗
SI01Site suitability assessmentCONCEPT WORKFLOW
PUBLICLY EXISTS

A defined evidence stack, hard-stop logic, ranked-option interface, decision trace and synthetic sample package.

NOT ESTABLISHED

No real parcel measurement, paid assessment, professional opinion, permit conclusion or field-validated scoring model is represented.

NEXT EVIDENCE

Controlled dataset → professional review → field comparison → repeatable assessment procedure

Inspect current basis ↗
EC01Build economics modelCONCEPT ESTIMATOR
PUBLICLY EXISTS

An interactive comparison for six proposed civil-work archetypes with editable labor, material, equipment, output and schedule assumptions.

NOT ESTABLISHED

It is not a bid, quotation, validated productivity claim or company unit-economics model; major project costs remain outside its boundary.

NEXT EVIDENCE

Supplier quotes + crew studies + test data + project WBS + ownership and service costs

Inspect current basis ↗
SIM01Swovee SimulatorPLAYABLE V1 / SYNTHETIC
PUBLICLY EXISTS

A playable two-act browser campaign: scan, excavate, qualify and build a stormbreak; face a visible synthetic dust front; resolve damage under scarce resources; then protect an imported pressure liner with a local-material shell. Choices and the on-device debrief remain local.

NOT ESTABLISHED

Its parameters are synthetic. It establishes no physical fidelity, field validation, predictive authority, product performance or customer evidence.

NEXT EVIDENCE

Expert review → explicit test hypotheses → physical-rig comparison → field-calibrated models only if evidence supports them

Inspect current basis ↗
MP01Earth material plantPROPOSED BASELINE
PUBLICLY EXISTS

Qualified-mortar, wet-bypass and processed-earth pathways with explicit inputs, rejection rules, dosing, mixing, pumping and captured cleanout logic.

NOT ESTABLISHED

No released structural recipe, validated process window, pressure design, wear record or production material passport is represented.

NEXT EVIDENCE

Instrumented dosing/mixing rig → lot variation → restart/blockage/cleanout tests → material qualification

Inspect current basis ↗
S01Scoop + BorePodA0 CONCEPT
PUBLICLY EXISTS

Target specifications, operating cycle, fault cases, Prep Dock interface and controlled concept geometry for an Earth analog demonstrator. The public download is imagery-only.

NOT ESTABLISHED

No fabricated rover, tonne-scale endurance result, licensed production geometry or flight configuration is represented.

NEXT EVIDENCE

IP/FTO decision → drum and BorePod rigs → simulant campaign → 20-tonne release condition

Inspect current basis ↗
M01Moon + Mars field cellTRL 2 CONCEPT
PUBLICLY EXISTS

A system-of-machines architecture for survey, excavation, feed preparation, local-material transformation, placement, inspection, power and delayed supervision.

NOT ESTABLISHED

No integrated offworld hardware, environmental qualification, flight manifest, agency endorsement or product availability is represented.

NEXT EVIDENCE

Simulant process → multi-tonne feed loop → environmental coupons → delayed autonomy → precursor decision

Inspect current basis ↗
SWIMSwovee Swim familyCONCEPT STUDY / UNBUILT
PUBLICLY EXISTS

A sourced system brief for a proposed 6,000-m-class survey vehicle, tethered work ROV, low-flow sampler and surface dock, plus a removable flux-control-shroud study.

NOT ESTABLISHED

No pressure-qualified vehicle, marine material process, hyperbaric test, regulator-selected remedy, field authorization or subsea performance record is represented.

NEXT EVIDENCE

Authority + data agreement → inert mock-up → hyperbaric component tests → full-depth surrogate trial → reversible monitored pilot decision

Inspect current basis ↗
N01Swovee Sentinel familyCONCEPT BRIEF / UNBUILT
PUBLICLY EXISTS

A sourced, non-playable architecture brief for repeatable geometry and radiation mapping, exposure-aware routing, light force-limited tool presentation and auditable recovery.

NOT ESTABLISHED

No nuclear-qualified machine, site task, operator invitation, site data, affiliation, radiation test, decontamination release or authorization is represented.

NEXT EVIDENCE

Named operator task → clean-site demonstrator → environmental qualification → witnessed recovery tests → official work-package integration decision

Inspect current basis ↗
02 / CLAIM LANGUAGE

SIX WORDS.
SIX DIFFERENT CLAIMS.

The status label follows the evidence. It does not advance because a rendering, model or target looks complete.

PUBLISHED

An artifact exists and can be inspected. Publication does not validate its engineering assumptions.

CONCEPT

A proposed architecture or workflow selected for investigation, not a completed product.

TARGET

A design aim, estimate or screening threshold that must be earned through test.

VALIDATED

Reserved for a named method, acceptance criterion, result and review record.

CERTIFIED

Reserved for the applicable independent authority and a defined product configuration.

AVAILABLE

Reserved for a real offer with scope, price, delivery basis, terms and accountable seller.

03 / EARTH RELEASE GATES

STATUS CHANGES
BY EVIDENCE.

The first pilot does not open because a date arrives. It opens when the prior configuration passes its acceptance basis.

  1. G0Architecture freeze

    Controlled requirements, hazards, budgets, interfaces and configuration ownership.

  2. G1Bench material loop

    Repeatable dosing, mixing, pumping, restart, blockage recovery and captured cleanout.

  3. G2Motion mule

    Stable poses, bounded re-registration and safe response to terrain, sensor and network faults.

  4. G3Coupled Alpha

    Every placed region linked to material lot, settings, path and as-built scan across relocations.

  5. G4Pilot release

    Independent safety, crew, service, structural and field-method acceptance for one bounded site.

CURRENT POSITIONBefore G0 / architecture work published

The public materials establish a candidate system boundary and test logic. They do not represent a frozen architecture, completed bench loop or released field machine.

04 / PUBLIC EVIDENCE COUNTERS

ZERO IS
USEFUL DATA.

Absence is recorded instead of hidden. A future result should retain method, date, configuration, exceptions and reviewer.

INTEGRATED FIELD HOURS0Published
THIRD-PARTY A02 CAMPAIGNS0Published
SIGNED PILOT SITESNONEPublicly announced
CUSTOMER LOIsNONEPublicly announced
PRODUCTION UNITS0Represented
CERTIFIED CONFIGURATIONS0Represented
05 / CAD DISTRIBUTION

PREVIEW PUBLICLY.
CONTROL THE SOURCE.

The public A0 archive now contains rendered concept imagery and a status notice only. STEP, STL, DXF, parametric source, BOMs, manifests and detailed interface records are held outside the deployed site pending patent, licensing, export and engineering-release review.

DISCLOSURE HISTORYContainment cannot undo earlier publication.

Editable files were previously available publicly. Replacing the archive cannot identify prior downloaders or control copies already obtained. The dated archive and disclosure inventory are preserved for qualified counsel.

06 / CONFIGURATION LANGUAGE

PRODUCT CODE
IS NOT MATURITY.

These identifiers prevent the Earth machine, CAD revision and offworld mission architecture from collapsing into one implied product.

A02Current Earth mobile additive-construction concept

A0Concept CAD release revision—not a readiness level

SIM01Playable browser vertical slice—not a digital twin or engineering predictor

S01Scoop excavation and bore-sampling concept

P01Prep Dock screening and batch-release concept

F01Offworld material-transformation concept

U01Offworld power and communications pallet concept

M01Moon/Mars multi-machine mission architecture

SWIMProposed Swovee Swim subsea machine family

N01Proposed nuclear inspection and logistics family

NEXT COMMERCIAL DECISION

PROVE THE LOOP.
THEN OPEN THE PILOT.

The proposed commercial path begins with a paid site assessment and proceeds to one bounded engineer-supervised civil pilot only after the required release evidence exists.

Review the proposed pilot →Read the validation gates →