ACTIVE TIME9.3 days
CALENDAR + CURE11.3 days
DIRECT LABOR$11,605
WORKER-HOURS148.8 h
Choose something Swovee might build. Compare active days, calendar time, direct worker-hours and modeled cost against a conventional method—then change every important assumption.
The first economic targets are distributed, geometrically variable civil works—not finished occupied buildings.
Qualified printable mortar, wall or channel geometry, normal site access, separate reinforcement where required, Earth A02 conditions and a two-person baseline crew.
Land, design fees, permits, excavation beyond minor preparation, foundations, roofs, utilities, doors, finishes, freight, taxes, financing, profit and project-specific code approval.
Useful where curvature and changing grade make conventional formwork expensive. Structural retaining use still needs geotechnical design, reinforcement and approval.
ACTIVE TIME9.3 days
CALENDAR + CURE11.3 days
DIRECT LABOR$11,605
WORKER-HOURS148.8 h
19.7% modeled cost reduction
1.9 calendar days earlierACTIVE TIME9.2 days
CALENDAR + CURE13.2 days
DIRECT LABOR$25,636
WORKER-HOURS442 h
Swovee hours = setup + volume ÷ output + relocation / inspection allowance.
Traditional worker-hours = base setup + volume × archetype labor intensity × geometry complexity.
Calendar = active shift-days + explicit curing allowance. Work can overlap in a real project.
The selected scenario makes the displacement visible instead of hiding it behind “productivity.”
Dry and liquid dosing, continuous mixing, pumping, bead placement, toolpath following, layer scanning and routine repositioning.
Site control, recipe release, reinforcement and inserts, finishing, maintenance, blocked-path recovery, structural acceptance and emergency authority.
Robot technicians, material-process operators, autonomy assurance, fleet supervision, digital survey and construction-data quality.
That would replace more direct placement labor. It should happen only after intervention frequency, recovery, material variability and work-zone safety are proven across many field hours. Until then, a two-person crew is a development assumption—not a labor promise.
The calculator is useful precisely because it can show Swovee losing. If the result depends on implausible output or day-rate assumptions, the project does not yet have an economic case.
The U.S. Bureau of Labor Statistics reports a May 2025 mean wage of $31.42/hour across construction and extraction occupations. It reports March 2026 average private-industry employer compensation of $46.60/hour. The model uses higher editable field rates to allow for specialization and contractor burdens beyond compensation.
Regional pricing, contractor overhead and profit, escalation, taxes, financing, bonds, insurance, freight, mobilization beyond the stated setup, permits, professional fees and scope outside the printed work.
Replace every default with quotations, crew studies, local wage burdens, a project WBS, material test data, equipment ownership costs, failure allowance and a schedule built by the delivery team.